Many Isollux products begin life as bespoke engineering solutions.

Working alongside architects, consulting engineers and specialist manufacturers, we develop purpose-designed luminaires, mounting systems and control solutions that broaden our product range and applications

QANTAS


Melbourne Engineering Hangars 3 &4

Project Date
Due for completion 2027


PowerBay 1010 – Durra Panel

Overview

As part of the upgrade of Engineering Hangars 3 & 4, Qantas required a high-performance LED lighting solution capable of operating reliably in ambient temperatures up to +70°C while integrating with the existing Durra Panel structural ceiling system. The project also required DALI controls, long-term serviceability and a certified mounting solution suitable for aviation maintenance environments.

Discover more > PowerBay

Fisher & Paykel Healthcare


Building 5 Cleanroom Manufacturing & Research Facility

Project Date
Due for completion 2027


Soffito SLP – Durra Panel

Overview

For its new 28,000 m² Building 5 research and manufacturing facility, Fisher & Paykel Healthcare required a cleanroom lighting solution integrated with a Durra Panel structural ceiling system. Working in partnership with Ortech Industries Pty Ltd, Isollux developed a purpose-designed mounting and sealing solution that preserves the integrity of the cleanroom envelope while maintaining the flexibility and long-term serviceability of the ceiling system.

Discover more > Soffito SLP

Development of PV3-M1 Steam CIP Solution

When SKT's new automated processing system combined aggressive chemical sanitation with high-temperature steam CIP, our Belgian partner Next Generation LED came to Isollux for a new LED solution, capable of withstanding such extreme conditions.

Project Date
Delivered Dec 2025

SKT



Overview

The solution was PV3-M1, a food-grade luminaire developed by Isollux specifically to withstand the heat, steam, chemicals and thermal cycling of modern automated food-processing tunnels.

Proline TPX had already performed successfully through more than two years of continuous testing at Agristo in Belgium, installed in their fryer-to-freezer clean-in-place (CIP) tunnels. This provided confidence in the underlying product architecture, but SKT’s latest tunnel specification would raise those requirements significantly.

SKT’s latest and fully automated processing system, removes the limitations of manual sanitation, resulting in far a more demanding combination of operating ambients that ranged from -30ºC to +70ºC aggressive sanitising chemicals dispensed at elevated ambient temperatures, followed by high-temperature steam CIP to remove processing residue and bacteria.

The luminaire therefore needed to withstand not simply high pressure wash-down, but repeated exposure to aggressive chemicals, steam, heat, humidity, hydrolysis and thermal cycling as part of the normal operating process all well beyond the capabilities of any luminaire on the market.

Discover more > PV3-M1